Connect with us

News

The Reading West revamp, plagued by delays and cost overruns, finally opens

Published

on


After numerous delays, the long-awaited Reading West Station upgrade initiative has finally opened, or at least all areas were fully open for the public this morning. The Reading Borough Council made the announcement today, confirming the completion of the initiative that began in October 2020.

The overhaul of the station, situated in Oxford Road, encompasses various enhancements aimed at improving safety and security for the local community and commuters. These improvements include new ticket gates, upgraded lighting, and the installation of CCTV cameras. Additionally, the new station building features an information counter, customer toilet facilities, and a space earmarked for potential retail ventures, though currently unoccupied. The project, which cost £5 million, slightly exceeded the initial estimated budget of £3.3 million. Collaboration between Reading Borough Council, Network Rail, and Great Western Railways facilitated the realization of this endeavor.

The project also incorporated the establishment of a new bus interchange, enhancements to cycle parking facilities, and the installation of pedestrian crossings. Furthermore, improvements have been made to the Tilehurst Road entrance as part of the comprehensive scheme.

Despite these advancements, our volunteer, Matthew Reynolds, noted during his visit this afternoon that the upgraded area was closed to the public, preventing him from accessing the interior. Nevertheless, he observed that the station’s exterior appeared aesthetically pleasing.

Advertisement

News

Reading families and businesses ‘left to fend for themselves’ as just 5.5% of burglaries result in charges

Published

on

By

New figures from 2025 show that of the 223,194 burglaries reported in England and Wales, just 13,936 (6.24%) resulted in someone being charged, whilst in a shocking 160,396 (71.86%) cases police failed to even identify a suspect. In the Thames Valley, those figures are a 5.55% charge/ summons rate, and 4,627 (68%) of cases where the police failed to identify a suspect.

Home Office data analysed by the Liberal Democrats have found that 94.5% of the 6,268 burglary cases reported in the Thames Valley result in the criminal getting away scot-free. Reading Lib Dems are demanding an urgent restoration of neighbourhood police funding.

Reading Lib Dems have slammed the Government’s handling of the situation as “asleep at the wheel”, calling out Andy Burnham for failing to commit to tackling crime since taking office.

Liberal Democrats have urged Ministers to get a grip on crime and bring forward emergency legislation to ensure that all domestic burglaries are attended by the police and properly investigated. Currently, the vast majority of burglars are getting away scot-free.

Advertisement

Local Lib Dems have urged the Prime Minister to bring in a ‘Burglary Response Guarantee’, to reassure families across Reading that burglaries will be investigated, and that the criminals involved will be brought to justice. 

James Moore, Lib Dem Councillor for Tilehurst, said:

“It is unacceptable that families and businesses across Reading are being left terrified as the vast majority of burglaries go unsolved. The Government has been asleep at the wheel; a persistent lack of support for community policing has left our streets vulnerable.

“In 94.45% of burglary cases, the victims never see someone charged – that has to change. Thames Valley Police works tirelessly but they require the proper resources and mandate from central government to ensure every single case is rigorously investigated.

“That’s why I’m demanding urgent action from the Prime Minister, to restore neighbourhood policing and back our calls for an investigation guarantee for all burglaries in Reading.”

Advertisement

Continue Reading

Events

DAY 1 – Reading Festival 2026: A Weekend of Big Performances, New Discoveries and Muddy Memories

Published

on

By

Charli xcx’s at Reading Festival - Photo Credit Henry Redcliffe

There is something about Reading Festival that you simply cannot replicate elsewhere. Every year, thousands of music fans descend on Richfield Avenue knowing that they are in for a weekend of huge performances, packed crowds, new discoveries and, almost certainly, some questionable weather. Reading 2026 was no different.

Across the weekend, the festival once again offered a huge variety of music, from rock and indie to rap, pop and electronic music. With major names including Charli XCX, Fontaines D.C., Dave, RAYE, Florence + The Machine and Chase & Status, there was plenty to keep the crowds moving from the opening acts through to the headline performances.

For us, one of the standout moments came from Charli XCX. Following the enormous cultural impact of her Brat era, it would have been easy to simply recreate that formula, but she chose to do something very different. Her performance was darker, more theatrical and heavily influenced by the sound and aesthetic of her latest work. A live band and army of dancers gave the set a completely different feel, while tracks such as 360, Von Dutch and Guess ensured that the Brat faithful still had plenty to scream along to.

There was also a reminder that Reading is a festival where you can stumble across something completely unexpected. Royal Blood surprised fans with a secret set at The Gallery, turning the tent into one of the liveliest places on site. Moments like this are part of what makes a festival special — you can plan your entire weekend around a timetable and still end up talking about something you never expected to see.

Advertisement

The weather, naturally, had its own plans. Rain arrived during the weekend and quickly transformed sections of the site into the familiar mixture of mud and wellies that British festival-goers know all too well. Rather than killing the atmosphere, it became part of the experience. Fans carried on dancing, artists played through the conditions and the festival carried on regardless.

Away from the biggest stages, there was plenty to discover. Geese, Declan McKenna, James Marriott, Skye Newman and Villanelle were among the artists providing some of the alternative sounds across the site, while the festival continued to give younger and emerging performers an opportunity to play to a much larger audience.

And that is ultimately what keeps Reading relevant. It isn’t simply about the headline acts. It’s about discovering an artist you hadn’t heard before, arriving at a stage because you have heard a great song from somewhere, bumping into friends in the crowd, getting completely soaked and still refusing to leave, or finding yourself watching a surprise performance that wasn’t even on your original plan.

Reading Festival 2026 delivered all of that. It was big, loud, unpredictable and occasionally very muddy — but above all, it was fun. And isn’t that exactly what a summer festival should be?

Advertisement
Continue Reading

News

Emergency Alert Sent to Phones Across South East as Heatwave and Wildfire Risk Escalates

Published

on

By


Residents urged to take extreme care with BBQs, cigarettes and anything that could start a fire

People across parts of South East England had their phones interrupted by an Emergency Alert this evening, warning of the serious risks created by the current heatwave and exceptionally dry conditions.

The alert was sent directly to compatible mobile phones, producing the distinctive loud siren-like sound and vibration used by the UK’s Emergency Alerts system.

This is not an ordinary weather notification. The national Emergency Alerts system is designed to warn people when there is a danger to life, with the message providing information about the emergency and what people should do to protect themselves and others. (Prepare⁠)

Advertisement

Why has the alert been issued?

The South East is experiencing exceptionally hot and dry conditions, creating a combination of extreme heat and heightened wildfire risk.

The UK Health Security Agency has an amber heat-health alert covering the South East, London and several other regions, currently extended until 10am on Saturday 15 August. (GOV.UK⁠)

The concern is not only about people becoming unwell in the heat. Dry grass, vegetation and woodland can ignite extremely easily, allowing fires to spread rapidly.

That is why residents are being urged to think carefully before using anything that creates a naked flame or produces hot embers.

Advertisement

BBQ warning: think twice before lighting one

One of the biggest concerns is the use of disposable BBQs.

A disposable BBQ may look harmless once the food has been cooked, but the charcoal and metal tray can remain extremely hot for a considerable amount of time.

In these conditions, a BBQ left on dry grass, thrown into vegetation or placed next to other combustible material could start a fire.

People should not use disposable BBQs in parks, woodland, heathland, fields or other areas where their use is prohibited or where there is a significant fire risk.

Advertisement

The Government has also introduced a temporary ban on the sale of disposable BBQs across the UK because of the wildfire danger. (Wales Online⁠)

Do not simply throw a BBQ in the bin

Another important message is about disposal.

Never put a hot or warm BBQ into a rubbish bin.

Hot charcoal can remain capable of igniting combustible material long after the visible flames have disappeared. A bin fire can quickly become a much larger incident, particularly during periods of extreme heat and dry weather.

Advertisement

Do not assume that a BBQ is safe just because it no longer has flames.

Allow it to become completely cold and follow local disposal guidance. If you are unsure, do not take the risk.

And never bury a hot disposable BBQ in sand or soil. Someone else could later step on the hot material and suffer serious burns, while buried embers can also remain a fire hazard.

Cigarettes and other sources of ignition

The warning extends beyond BBQs.

Advertisement

A cigarette end thrown onto dry grass can potentially start a fire. So can a campfire, fire pit, fireworks, glass or other objects that create or concentrate heat.

During these exceptionally dry conditions, people should avoid anything that could accidentally ignite vegetation.

If you see a fire starting in open land, move away from the area and report it to the emergency services when it is safe to do so. Do not put yourself at risk trying to tackle a rapidly spreading fire.

The heat itself can also be dangerous

The Emergency Alert comes as health authorities continue to warn about the effects of extreme temperatures.

Advertisement

People are being advised to:

  • Drink plenty of water and other fluids.
  • Stay out of direct sunlight during the hottest part of the day.
  • Keep homes as cool as possible.
  • Avoid strenuous exercise during the hottest hours.
  • Check on elderly or vulnerable relatives, friends and neighbours.
  • Never leave children or animals in parked vehicles.

Symptoms of heat exhaustion can include heavy sweating, dizziness, weakness, headache and nausea.

Confusion, loss of consciousness or a seizure can indicate heatstroke, which is a medical emergency.

Take tonight’s alert seriously

Receiving an Emergency Alert on a phone can be unsettling, particularly when it arrives unexpectedly in the evening.

But the purpose of the system is precisely to make sure people receive an urgent warning when authorities believe there is a significant threat to life.

Advertisement

The message should be read carefully and the instructions followed.

For people across the South East tonight, the wider message is straightforward:

Stay cool. Stay safe. Avoid unnecessary outdoor flames. Do not use BBQs where they are prohibited or unsafe. Never leave hot charcoal behind, and never put a hot BBQ into a bin.

With the ground exceptionally dry, what might normally be considered a small and manageable source of heat can become the starting point for a serious wildfire

Advertisement
Continue Reading

Trending

Copyright © 2026 Reading west.